APS and PowerSecure Partner for Yuma Marine Corps Air Station 25MW Microgrid, Phase 1—Yuma, AZ


February 9, 2018 
Wake Forest, N.C.
Madison Rozakos
 
PowerSecure, as an integrated solutions provider, engineered, designed, manufactured and installed a 25MW microgrid solution for Yuma Marine Corps Air Station in Yuma, AZ.

Through PowerSecure’s Interactive Distributed Generation (IDG), a full-service, comprehensive approach to demand response and standby power requirements provided 100 percent energy coverage base-wide, mitigating external electrical grid failures, and providing backup power to cover the base’s current and projected energy requirements.

PowerSecure’s IDG Tier 4 Final on-site generation asset, coupled with integrated battery storage systems and PowerSecure switchgear, afforded the ability to monitor and service the system 365/24/7, control and dispatch generating assets, energy storage resources and load assets needed to optimize the microgrid’s performance.

With industry-leading reliability, PowerSecure improved the economics for energy surety at Yuma by capturing value from the energy markets to further provided to the benefit of the utility and the customer.






︎ Work